Skip to main content

Table 4 Results of the pilot test

From: Surgery scheduling heuristic considering OR downstream and upstream facilities and resources

Date Occupation Number of procedures Variance of BIMs
07/20/2016 83.90% 30 356.23
07/21/2016 77.72% 30 355.74
07/22/2016 72.36% 29 224.51
07/23/2016 75.04% 26 421.88
07/24/2016 83.85% 23 1108.54
07/27/2016 80.42% 33 245.03
07/28/2016 81.26% 31 265.15
07/29/2016 74.11% 27 271.28
07/30/2016 77.32% 27 138.63
07/31/2016 75.93% 29 308.45
Average 78.19% 28.50 369.54