Skip to main content

Table 5 Costs for Saturday service for control and intervention groups

From: Additional saturday occupational therapy for adults receiving inpatient physiotherapy rehabilitation: a prospective cohort study

Cost Categories

Control Group

(Nov 2015-March 2016)

AUD2016

Intervention Group

(Oct 2016-March 2017) AUD2016

Wage Costs for Saturday Service

Physiotherapy (base rate)

$45

$46

 Casual loading 25%

$11

$12

 Hospital overheads 30%

$14

$14

 Saturday loading 50%

$23

$23

 Total per hour

$93

$95

Cost per week

 3.5 h/week in control group

$325

 

 4 h/week in intervention group

 

$381

 Cost for 20 weeks

$6,503

$7,619

Registered Nurse for porterage (base rate)

$45

n.a

 Casual loading 25%

$11

 Hospital overheads 30%

$14

 Saturday loading 50%

$23

 Cost per hour

$93

 Cost per week (2 h per week)

$185

 Cost for 20 weeks

$3,701

Occupational therapist (base rate)

n.a

$47

 Casual Loading 25%

$12

 Hospital overheads 30%

$14

 Saturday loading 50%

$23

 Cost per hour

$95

 Cost per week (4 h per week)

$381

 Cost for 20 weeks

$7,619

Allied Health Assistant (base rate)

n.a

$28

 Casual loading 25%

$7

 Hospital overheads 30%

$8

 Saturday loading 50%

$14

 Cost per hour

$57

 Cost per week (4 h per week)

$230

 Cost for 20 weeks

$4,592

Wage operating costs allocated to interventiona

$1,932

$2,176

Total costs for Saturday service

$12,137

$22,007

Ward operating costs

 Housekeeping Supplies

$5,896

$5,475

 Laundry Supplies

$37,160

$36,436

 Printing & Stationery

$3,204

$5,677

 Property Expenses

$9,940

$20,009

 Marketing & Entertainment

$1,007

$0

 Catering—Functions

$4,399

$2,633

 Hospital Contractor Servicesb

$7,366

$7,145

 Rates & Body Corporateb

$1,280

$1,313

 Utilitiesb

$7,354

$6,755

 Finance & Accountingb

$309

$344

 Insuranceb

$3,233

$3,436

 Total ward overheadsb

$81,147

$89,223

  1. a2.4% of the total ward overheads were allocated to the intervention because the intervention consumed 4/168 h per week. bHospital overheads (0.82%) were allocated the operation of the rehabilitation ward. All costs reported as AUD2016 and rounded to the nearest dollar. Summary costs are adjusted to AUD2020 when transferred to Table 6
  2. Abbreviation n.a not applicable