Skip to main content

Table 3 Cost reduction for hospital

From: Medico-economic impact of enhanced rehabilitation after surgery: an exhaustive, nation-wide claims study

Segment / Sector

1 = Pub

2 = Pri

Cost

Non- ERAS ALOS

Cost per day

Mean cost reduction per stay (€)

CI 95%

Cost reduction for additional 1% ERAS stays (€)

CI 95%

01-THR / 1

4780.12

6.88

694.95

1174.47

1116.85 to

1228.09

179,753.11

170,933.99 to

187,958.58

01-THR / 2

4848.39

6.80

712.89

1066.28

1035.71 to

1097.44

311,119.50

302,200.30 to

320,211.47

02-TKR / 1

5951.78

7.78

765.26

1303.05

1224.99 to

1375.36

226,404.27

212,841.23 to

238,968.70

02-TKR / 2

6083.25

7.70

789.67

1236.92

1198.48 to

1275.25

406,278.16

393,654.06 to

418,869.25

03-TSR / 1

4766.93

6.18

770.84

1418.91

1054.32 to

1789.32

10,485.71

7791.42 to

13,223.06

03-TSR / 2

4989.82

5.15

969.49

1397.99

1239.99 to

1558.97

46,357.24

41,118.09 to

51,695.41

04-HDS / 1

2635.25

4.21

625.95

179.28

27.86 to

395.68

3270.15

− 508.19 to

7217.19

04-HDS / 2

2221.21

3.72

596.72

651.78

610.30 to

691.42

130,401.97

122,102.41 to 138,332.02

05-HCR / 1

5214.23

7.27

717.36

1099.26

617.27 to

1609.90

2660.21

1493.78 to

3895.95

05-HCR / 2

4747.30

5.22

909.99

1146.14

1003.38 to

1287.60

100,035.26

87,575.17 to

112,381.96

07-OBE / 1

2895.90

4.00

723.59

660.54

569.58 to

743.01

31,382.35

27,060.80 to

35,300.19

07-OBE / 2

3406.49

4.24

803.02

880.13

832.66 to

931.70

84,632.83

80,068.63 to

89,592.24

08-COL-1 / 1

3923.23

12.92

303.59

611.86

476.48 to

756.24

13,130.57

10,225.27 to

16,228.81

08-COL-1 / 2

3692.20

11.26

328.01

459.62

318.63 to

595.90

7137.87

4948.30 to

9254.39

09-RRC / 1

5262.53

20.09

261.90

454.44

146.19 to

737.06

1504.21

483.88 to

2439.65

09-RRC / 2

4844.81

14.76

328.26

611.80

371.84 to

862.04

3303.69

2007.96 to

4655.03

10-HYS-1 / 1

2408.29

2.89

832.67

729.90

616.00 to

838.61

84,617.07

71,413.29 to

97,220.58

10-HYS-1 / 2

2195.00

3.29

667.18

525.70

446.67 to

609.49

49,710.26

42,237.57 to

57,633.34

10-HYS-2 / 1

3681.90

7.15

514.60

169.12

− 180.16 to

483.69

862.49

− 918.81 to

2466.84

10-HYS-2 / 2

3239.41

7.25

446.88

607.13

342.06 to

872.99

1366.04

769.63 to

1964.24

11-TPR / 1

5613.06

5.31

1056.46

1848.34

1617.55 to

2094.14

47,761.12

41,797.55 to

54,112.48

11-TPR / 2

4690.24

6.38

735.24

1552.93

1416.73 to

1694.84

77,351.40

70,567.36 to

84,420.06

12-TPM / 1

4414.12

10.94

403.49

636.63

460.88 to

820.54

5818.82

4212.49 to

7499.72

12-TPM / 2

4362.43

11.43

381.63

930.48

639.35 to

1244.00

1014.22

696.89 to

1355.96

TOTAL / AVERAGE

  

1059.89

994.60 to 1124.74

1,826,358.53

1694,773.08 to

1,956,897.12