Skip to main content

Table 2 Results from early adopter survey: ‘How involved have local commissioners been in the design of your early adopter project (from February 2014 to now)?’

From: Evaluating the design and implementation of the whole systems integrated care programme in North West London: why commissioning proved (again) to be the weakest link

  Local authority adult social care Local authority public health CCG NHS England (London)
Extremely involved 14% 5% 57% 3%
Very involved 44% 25% 30% 12%
Moderately involved 24% 3% 9% 23%
Slightly involved 15% 39% 2% 32%
Not at all involved 4% 27% 1% 30%
Total 100% 100% 100% 100%
N 80 59 82 77
  1. Source: Survey of WSIC EAs conducted from November–December 2014