Factor | Variable | Loading | Standard error |
---|---|---|---|
Structure | A1 | 0.88** | 0.060 |
 | A3 | 0.78** | 0.065 |
 | A4 | 0.98** | 0.079 |
 | A5 | 1.19** | 0.071 |
 | A6 | 1.06** | 0.070 |
Process | B1 | 0.59** | 0.069 |
 | B4 | 1.14** | 0.063 |
 | B5 | 1.21** | 0.057 |
 | B6 | 1.04** | 0.065 |
Outcome | C1 | 1.12** | 0.065 |
 | C2 | 1.38** | 0.066 |
 | C3 | 1.17** | 0.083 |
 | C4 | 0.96** | 0.078 |