Skip to main content

Table 2 Test-retest comparisons of indicators of PRISM inputs and outputs, 2004 and 2007.

From: Evaluation of the Performance of Routine Information System Management (PRISM) framework: evidence from Uganda

Variable

2004

2007

Standard Error of Difference

(2004-2007)

T of Difference

(p value)

Use of information

0.61

0.51

0.07

-1.46

 

(0.49)

(0.50)

 

(0.15)

 

110

117

  

Culture of information

    

   Overall

61.9

75.5

1.65

8.25

 

(13.60)

(13.20)

 

(0.00)

 

100

192

  

   Use

64.4

78.7

1.95

7.32

 

(17.10)

(15.61)

 

(0.00)

 

107

192

  

   Evidence

60.3

73.1

2.00

6.40

 

(17.18)

(16.02)

 

(0.00)

 

105

192

  

   Reward

57.5

68.0

2.43

4.32

 

(20.20)

(20.10)

 

(0.00)

 

108

192

  

Self-efficacy

    

   Overall

69.5

59.9

2.76

-3.48

 

(20.67)

(21.86)

 

(0.00)

 

90

185

  

   Analyzing

68.1

60.4

3.19

-2.43

 

(24.72)

(25.90)

 

(0.02)

 

98

185

  

   Interpreting

72.9

56.4

3.06

-5.39

 

(21.52)

(26.08)

 

(0.00)

 

99

185

  

   Using

70.8

58.5

2.82

-4.39

 

(20.82)

(23.40)

 

(0.00)

 

98

185

  

Motivation

72.2

77.6

1.57

3.41

 

(13.05)

(11.50)

 

(0.00)

 

84

192

  

Tasks competency

    

   Calculation

44.1

52.5

4.96

1.69

 

(38.08)

(42.55)

 

(0.09)

 

108

186

  

   Interpretation

21.6

73.4

8.01

6.47

 

(25.79)

(81.23)

 

(0.00)

 

109

186

  

   Use

2.8

21.9

3.17

12.89

 

(16.51)

(30.43)

 

(0.00)

 

108

108

  
  1. Note: Means, standard deviations (in brackets) and sample sizes are reported above for each survey. The indicator of "use of information" is measured at the facility-level. All other indicators are measured at the health worker-level. The standardized difference between the groups is defined as the difference in the means between the two surveys and scaled by the overall standard deviation.