Skip to main content

Table 3 Change in DCOB within baseline, and phases 1, 2 and 3 (slope) and difference in DCOB between baseline and phases 1, 2 and 3 (intercepts)

From: Increasing and sustaining discharges by noon – a multi-year process improvement project

Characteristic

ORa

95% CIa

p-value

Baseline Slope

0.80

0.48, 1.33

0.4

Phase 1 Intercept

1.49

1.01, 2.20

0.046

Phase 1 Slope

0.80

0.52, 1.21

0.3

Phase 2 Intercept

1.38

0.90, 2.13

0.14

Phase 2 Slope

1.92

1.49, 2.49

 < 0.001

Phase 3 Intercept

5.54

2.86, 10.7

 < 0.001

Phase 3 Slope

1.88

1.43, 2.48

 < 0.001

  1. aOR Odds Ratio, CI Confidence Interval