Skip to main content

Table 2 Change in DBN within baseline period (slope) and difference in DBN between baseline and phases 1, 2 and 3 (intercepts)

From: Increasing and sustaining discharges by noon – a multi-year process improvement project

Characteristic

OR1

95% CIa

p-value

Baseline Slope

0.93

0.65, 1.34

0.7

Phase 1 Intercept

2.22

1.72, 2.85

 < 0.001

Phase 2 Intercept

2.23

1.79, 2.77

 < 0.001

Phase 3 Intercept

2.48

1.94, 3.16

 < 0.001

  1. aOR Odds Ratio, CI Confidence Interval